Work Time Tracking Calendar for Jira v 5.4.x: Reports

To switch from Calendar mode to Reports mode, click the Reports mode button, located on the top right corner of the screen.

 

You'll be presented by the next screen. Here, you can configure the fields to be displayed on the reports.

 

The four fields are configured for the reports by default. These are: Project, Key, Day, and User(s).

You can add, remove or rearrange the fields by using drag-and-drop, on the report fields configuration. 

For your convenience, we've also implemented the feature to add the fields that are specific for the worklog reports to the report configuration. Such as Worklog User, Worklog Time, Worklog Description, Worklog Start, Worklog End and Worklog User Email .

Please note, in case a user has set his or her email visibility to Only You and Admin, in cloud version, user's email will not be shown on reports. In server version, the email display on reports will be according to Jira configuration: Administrations > System > General configuration > Options > User email visibility

 

Before generating a report, please make sure that all required sources and users are enabled, on the left panel.


In addition, make sure to check the selected start and end dates:



Set worklog grouping by selected fields if needed:

Click the Show button to generate a report:

Your report might look similar to the one shown below:

The generated report has static header and footer. This comes handy when a generated report contains a lot of data.

In addition, the issue displayed on a report can be opened in Jira simply by clicking on it.

 

The reports can be generated for the multiple calendars as well:

Please note that in case the field doesn't have a value, is empty, it is shown as "not available", on reports.

 

The list of Work Time Calendar fields that can be used in reports but aren’t present in Jira:

Field

For planning event

For worklog event

Field

For planning event

For worklog event

Event Source

The name of a source

Day

The day the start of an event falls on

Week

The week the start of an event falls on

Month

The month the start of an event falls on

Event Reporter

The user who created an event that is based on a planning source

not available

Event Description

The description for an event that is based on a planning source

not available

Event Summary

The summary for an event that is based on a planning source

not available

Event User(s)

The user(s) to whom a planning event is assigned to

not available

Worklog User

not available

The user who created an event that is based on a worklog source

Worklog Description

not available

The description for an event that is based on a worklog source

Worklog Time

not available

The time a user has reported

Worklog Start

not available

The start of worklog event

Worklog End

not available

The end of worklog event

Worklog User Email

not available

The email of a user who created a worklog event

Time

Always present in reports as the last column

User(s)

The user(s) to whom a planning event is assigned to

The user who created a worklog

Σ Description

The description of a planning event

The description for an event that is based on a worklog source

Σ Summary

The summary of a planning event

The summary of the issue a worklog event is based on

Σ Reporter

The user who created a planning event

The user who added a worklog

Σ Epic

It prints the epic issue key for the epic itself, epic issues and sub-tasks that are part of the epic issues.

The common scenario is to group by this field to get total time for the epic. It is calculated as sum of all Time fields (i.e. duration for planning events and spent time for worklog events).

  • epic issue

  • issues that belong to an epic (i.e. epic issues)

  • sub-tasks that are part of epic issues

Please see the FAQ page https://brizoit.atlassian.net/wiki/spaces/WTCDOCS/pages/2951087793/Work+Time+Tracking+Calendar+for+Jira+v+5.4.x%3A+FAQ#In-my-report%2C-I-want-to-see-the-total-work-logged-for-the-epic-task-and-its-tasks

Σ Epic Name

It prints the epic name for the epic itself, epic issues and sub-tasks that are part of the epic issues.

The common scenario is to group by this field to get total time for the epic. It is calculated as sum of all Time fields (i.e. duration for planning events and spent time for worklog events).

  • epic issue

  • issues that belong to an epic (i.e. epic issues)

  • sub-tasks that are part of epic issues

Please see the FAQ page https://brizoit.atlassian.net/wiki/spaces/WTCDOCS/pages/2951087793/Work+Time+Tracking+Calendar+for+Jira+v+5.4.x%3A+FAQ#In-my-report%2C-I-want-to-see-the-epic-name-in-case-there-is-an-epic-link-for-a-task

Σ Parent

It prints the issue key for the parent issue and sub-tasks that are part of the issue.

The common scenario is to group by this field to get total time for the parent issue. It is calculated as sum of all Time fields (i.e. duration for planning events and spent time for worklog events).

  • parent issue

  • sub-tasks that are part of parent issue

Please see the FAQ page https://brizoit.atlassian.net/wiki/spaces/WTCDOCS/pages/2951087793/Work+Time+Tracking+Calendar+for+Jira+v+5.4.x%3A+FAQ#In-my-report%2C-I-want-to-see-the-total-work-logged-for-the-parent-task-and-its-sub-tasks