Advanced Roadmaps support in Data Center / Server
Given that you are using Advanced Roadmaps for Jira, you can create Gantt charts to represent your plans.
Let’s assume you’ve configured the next hierarchy levels in Jira.
  |
---|
Then, you’ve selected the fields Target start (start) and Target end (end) to visualize the work on the timeline in your plan.
  |
---|
The plan can be replicated in Gantt Suite by creating and configuring a Gantt chart, using the project the plan is based on, the configured fields and a special link type configuration called ‘Advanced Roadmaps: Parent Link’.
  |
---|
  |
---|
  |
---|
When working with Gantt chart, you can affect the Advanced Roadmaps plan hierarchy in Jira by drag-and-dropping the issues in accordance to configured hierarchy levels.
Let’s say, there is an issue without parent, in your current plan.
  |
---|
In Gantt chart, simply, drag-and-drop the issue to a desired parent. As a result, the issue will obtain a parent task thanks to configured Parent Link dependency in chart configuration.
  |
---|
The change made in Gantt Suite will be reflected in Jira.
  |
---|